TECP-90-814 • Rev C • October 2020
Page 25
© 2020
CommScope
. All Rights Reserved.
Figure 29. Mounting Panel Shell in Rack
6. Connect a grounding wire to the panel in either of the two locations shown in
using the two #10-32 screws and star washers provided. A two-hole grounding lug (not
provided but shown here for reference) is recommended for the connection.
Figure 30. Grounding Rapid Fiber Panel
Note:
Ground the unit to the local facility CBN (Common Bonding Network) or IBN
(Isolated Bonding Network) per local practice.
3 INCHES
12-24 SCREW
AND LOCK WASHER
(4 PLACES)
26158-A
26159-A
10-32
SCREWS
(TIGHTEN
SECURELY)
STAR
WASHERS
FRONT
GROUNDING
LOCATION
REAR GROUNDING LOCATION
NOTE: FRONT GROUNDING IS NOT
AVAILABLE WHEN THE MOUNTING
BRACKETS ARE INSTALLED IN THE
2-INCH RECESS POSITION