Instruction Sheet
Page 11 of 21
Step 4C – Adapter Panel Application
1. Starting at location A (the left-most position), plug an adapter panel into the bulkhead cutout, as shown in
figure above.
2. Terminate a fiber pigtail into adapter panel, color keying as required. Repeat for all remaining locations.
Bundle all pigtails together with a suitable device that will not damage the fibers (e.g. twist tie or hook-and-
loop strip) at approximately 1-foot (305mm) increments.
3. Spool fiber bundle into slack fiber management rings in a clock-wise direction as shown.
4. Repeat items 1 through 3 for the next five consecutive adapter panel locations (locations B through F).
5. Starting at location G (seventh location from the left side), repeat items 1 through 4 for all remaining locations
(locations G through M).
6. Pigtails from locations A through F are to be spooled into the first set of slack fiber management rings (four
rings on the left-hand side of the shelf). Fibers from locations G through M are to be spooled into the second
set of slack fiber management rings (four rings on the right-hand side of the shelf).