860452168
Instruction Sheet
www.commscope.com
Page 4 of 21
Step 1 – Verify Parts and Install Labels
1. Verify parts shipped with this unit against the parts listed in the table below.
2. Apply shelf ID labels to bulkhead, located approximately as shown, one on each side of panel (outside and
inside).
Loose Parts Furnished with Shelf
Quantity
Description
1
Front door
2
Hardware bezel cover
3
Label hangers
1
Flip label holder
6
Oblong fiber rings
11
Round fiber rings
2
LH cable protectors
2
RH cable protectors
3
Flat tie holders
4
12-24 x 1/2 screws
4
M6 x 12 screws
1
Instruction sheet
Pull to open,
push to close
latch
Shelf ID label
Bulkhead
Front door
Oblong fiber ring
Hardware bezel cover
Shelf assembly
Cable
protectors