INS_NWKSP3_REV– 07/10/14 PAGE 16
INSTALLATION AND OPERATION MANUAL
NWKSP3
TECH SUPPORT: 1.888.678.9427
Once batteries are connected to the controller, connect the PV cables from the solar panels to the
Solar Load terminals on the controller.
Solar Panel Cables Connected to Solar Load Terminals on Controller
Connect the 12" Bonded Red and Black cable to the green terminal adaptor then connect the
other end of the cable to the load terminals on the controller.
Red and Black Cable Connected Green Terminal Connector, left, and to Load Terminals on Controller, right.
Insert green terminal into the Power Injector.
Green Terminal Connector attached to Power Injector
See Solar Charge Controller User Manual for instructions on how to use the controller.
Solar Panel mounting instructions will be included with the mounting hardware.