background image

INS_NWKSP3_REV–     07/10/14     PAGE 20

INSTALLATION AND OPERATION MANUAL 

NWKSP3

TECH SUPPORT: 1.888.678.9427

© 2014 Communications Networks Corporation. All Rights Reserved. “ComNet” and the “ComNet Logo” are registered trademarks of Communication Networks, LLC. 

3 CORPORATE DRIVE | DANBURY, CT 06810 | USA 

T: 203.796.5300 | F: 203.796.5303 | TECH SUPPORT: 1.888.678.9427 | INFO@COMNET.NET

8 TURNBERRY PARK ROAD | GILDERSOME | MORLEY | LEEDS, UK LS27 7LE

T: +44 (0)113 307 6400 | F: +44 (0)113 253 7462 | INFO-EUROPE@COMNET.NET

ComNet Customer Service

Customer Care is ComNet Technology’s global service center, where 

our professional staff is ready to answer your questions at any time. 

Email ComNet Global Service Center: customercare@comnet.net

Contact Information

ComNet – www.comnet.net

North America

ComNet Corporate Headquarters  
and Customer Support Center

Tel: +1-203-796-5300
Tel: +1-888-6789427
Email: info@comnet.net

EMEA, PACRIM, 
South America

ComNet Europe Ltd, Leeds

Tel: +44 (0)113 307 6400
Tel: +44 (0)113 307 6409
Email: info-europe@comnet.net

Summary of Contents for netwave NWKSP3

Page 1: ...lar panels valve regulated lead acid batteries outdoor enclosure solar charge controller PoE midspan injector and mounting hardware The steel outdoor enclosure has a gasket hinged lid with two tamper...

Page 2: ...anual Solar Panel mounting instructions included with the mounting hardware Website For information on ComNet s entire product line please visit the ComNet website at http www comnet net Support For a...

Page 3: ...out This Guide 2 Related Documentation 2 Website 2 Support 2 Safety 2 Overview 4 Legal Information 4 Introduction 5 Typical Setup 6 Mounting Assembly 7 Preparing the Enclosure 10 Pole Mount 12 Solar P...

Page 4: ...by any means electronic and mechanical for any purpose without the express written permission of ComNet Copyright Copyright 2014 ComNet All rights reserved Disclaimer ComNet reserves the right to make...

Page 5: ...id batteries outdoor enclosure solar charge controller PoE midspan injector and mounting hardware The steel outdoor enclosure has a gasket hinged lid with two tamper proof locks operated by a special...

Page 6: ...Setup Camera Connects to NetWave Unit Cabinet Houses Batteries Controller Power Injector Drip Loops Use on all exterior cabling NetWave Unit Connects to Power Injector Solar Panel Connects to Control...

Page 7: ...ole remove the orange panel mount from inside the cabinet Orange Panel Mount Removed from Cabinet Attach the horizontal mounting braces to the cabinet at the top and bottom Connect the two halves of t...

Page 8: ...INS_NWKSP3_REV 07 10 14 PAGE 8 INSTALLATION AND OPERATION MANUAL NWKSP3 TECH SUPPORT 1 888 678 9427 Mounting Hardware Pole Mount...

Page 9: ...n back of enclosure Reinstall the orange panel after the pole mounting hardware is installed If mounting the enclosure to a wall you can skip this step and mount the enclosure directly to a wall by at...

Page 10: ...ure Attach grounding wire to the door and enclosure Remove plastic covers on copper studs Add grounding cable to the two studs and use the copper washers and nuts to secure Grounding Cable Installed M...

Page 11: ...Power Injector Mounted on DIN Rail Plug the external thermal sensor into the interface of the thermal sensor on the left of the controller Thermal Sensor Plugged into Controller Insert battery platfor...

Page 12: ...pole use the 6 included Stainless Hose clamps to secure the enclosure to a pole For your safety we highly recommend mounting the enclosure before installing the batteries Enclosure Mounted to Pole wit...

Page 13: ...ables to the controller yet it is recommended to connect the battery first Enclosure Mounted to Pole with Clamps The NWKSP3 Kit will need to be configured in a 24V series Connect the MC4 Male Positive...

Page 14: ...nto the enclosure on their side and stack them Batteries Placed into the Enclosure Connect battery cables The NWKSP3 Kit will need to be configured in a series then connected to the controller First c...

Page 15: ...he door in case of earthquake or vibration Rubber Insulator Connect the 24 10AWG Red and Black cables to the positive and negative battery terminals that were not used in the previous step PV Cable Co...

Page 16: ...ct the 12 Bonded Red and Black cable to the green terminal adaptor then connect the other end of the cable to the load terminals on the controller Red and Black Cable Connected Green Terminal Connecto...

Page 17: ...dential area is likely to cause harmful interference in which case the user will be required to correct the interference at his own expense Industry Canada This Class A digital apparatus complies with...

Page 18: ...Ireland Austria Belgium Denmark Finland France Germany Ireland Italy Netherlands Norway Portugal Romania Switzerland Sweden Installer Compliance Responsibility Devices must be professionally installed...

Page 19: ...granted a license to that software under the terms of either the GNU General Public License or GNU Lesser General Public License License copies of which are available from http www gnu org licenses li...

Page 20: ...Y LEEDS UK LS27 7LE T 44 0 113 307 6400 F 44 0 113 253 7462 INFO EUROPE COMNET NET ComNet Customer Service Customer Care is ComNet Technology s global service center where our professional staff is re...

Reviews: