6-7-06 - Fifth Proof
3-17
Pre-Start Inspection and Operation
4. When the machines mounting plates top edge is seated in the attachment mounting plate, curl
the machines mounting plate backwards slightly to allow the lower edge of the machines
mounting plate to slide into position. See Figure 3–22.
Figure 3–22 Attachment Installed
5. Shut the engine off.
6. Rotate the attachment lock pins (Item 1, Figure 3–22 and Item 1, Figure 3–23) into the
locked position, securing the attachment to the machine.
Figure 3–23 Attachment Locks in Locked Position
7. Test the security of the attachment connection by fully lowering with loader arm and tilting
the attachment downwards until the front tires slightly lift off the ground.
1
2029
1
1
2022
Pins Locked
Summary of Contents for BOXER 427 Operators
Page 2: ...6 7 06 Fifth Proof...
Page 6: ...6 7 06 Fifth Proof iv Mertz Manufacturing LLC P O Box 150 Ponca City OK 74602 Affix Stamp Here...
Page 8: ...6 7 06 Fifth Proof vi...
Page 18: ...6 7 06 Fifth Proof 1 8 Safety Precautions...
Page 31: ...6 7 06 Fifth Proof 3 5 Pre Start Inspection and Operation Figure 3 4 Lubrication Points 2128...
Page 52: ...6 7 06 Fifth Proof 3 26 Pre Start Inspection and Operation...
Page 74: ...6 7 06 Fifth Proof 4 22 Routine Service and Maintenance...
Page 85: ...6 7 06 Fifth Proof...