NOTE
Each HP MCS is capable of cooling up to 35 kW of IT equipment.
Two or more HP MCS racks with a maximum ITE load will require
additional UPS support. Online utilities for calculating the power
requirements for HP server products are available at the URLs
provided in the section titled “
For more information
” at the end of
this paper.
Conclusion
In the past, data center architects have had to research IT equipment and power distribution products
from different sources to build a complete datacenter. There were always concerns of how easily,
efficiently, and reliably components from different vendors would interface and work with each other.
HP three-phase power solutions are designed to integrate easily with HP IT systems for maximum
efficiency.
The HP vision is to provide customers with a turnkey solution for their IT needs. Systems that have
been designed and tested to work with each other inherently provide better performance and require