Cabling a Single Device Expansion Shelf
Subsystem
1.
Ensure the physical installation phase of installing and securing shelf
brackets and shelves (including the UPS) has been accomplished and
that the shelves are secured within the shelf bracket the shelf lock
provided.
2.
Remove the device I/O module from the controller shelf and ensure the
switch positions of SCSI bus termination switch S4 are set as shown in
Figure 3-9. Replace the module in the controller shelf.
3.
Remove the personality I/O module from the device expansion shelf and
set SCSI bus termination switch S4 on this module as shown in
Figure 3-9.
4.
Ensure SCSI bus address switch S3 on the personality I/O module is set
for the device addresses as shown in Figure 3-9. Replace the module in
the device expansion shelf.
5.
Connect the black AC power cords (supplied with the shelves) from the
AC power source to the outside power supply on each shelf
(see Figure 3-10).
6.
Connect the gray power cables from the inside power supply on each
shelf to the power receptacles on the back of the UPS (ensure the UPS is
connected to an AC source).
7.
Connect a 0.5-meter SCSI cable (BN37A-0E) from the top SCSI
connector on the Controller shelf device I/O module (device bus 1) and
the SCSI connector on the front of the personality I/O module on the
expansion shelf.
8.
Connect a 5-meter SCSI cable (BN37A-05) between the host-in
connector on the controller shelf host 0 I/O module (bottom connector)
and the corresponding connector on the host system.
9.
Connect the maintenance serial control cable (17-04730-01) from the
CTR 0 connector on the controller shelf host 0 I/O module to the
corresponding connector on the maintenance PC.
10.
Connect the UPS serial control cable (17-04729-01) from the UPS
connector controller shelf host 0 I/O module to the like connector on the
UPS.
11.
Install jumper connector 12-49700-01 to the controller shelf UPS
connector on the host 1 I/O module.