COMPCOOLER, PERSONAL THERMAL TECHNOLOGY
8
ICE Cubes option:
For instant use, fill ICE cubes with small amount water into Roll Top.
(ICE cubes may melt faster than frozen bladder.)
Cleaning and Drying
Disconnect bladder from cooling unit and remove moisture, then hang to dry.
Operation step I
1.
Bladder connection:
Fill in small amount circulation water into roll top for quick operation
Connect bladder with waistpack unit by quick fittings
Tips: if bladder was not lay flat or not create an air packet in the fridge, quick fittings are
possible to be froze, please be patient for fitting melt or unfreeze quick fittings by tap
water.
2.
Battery connection
Connect battery with pump unit by 4017 plug
Operation Step II
1.
Liquid Cooling Vest:
Put on liquid cooling vest, adjust sides body fit
device and make sure cooling channel contact
your skin.
Tips: User may adjust the size to a comfortable
range and get better cooling performance.
2.
Waistpack
Pull on waistpack, tight the strap, connect quick fitting with cooling vest, once you hear
a click, it’s in position.
Tips: no difference for inlet or outlet for cooling vest connection.
3.
Start cooling
User may press On/Off switch to start cold water circulation or stop circulation.
Please make sure vest be connected before circulation.
4.
Extend cooling time
User may replace the frozen bladder to extend cooling time.
User may fill in ICE cubes for quick cooling operation.