Installation Instructions
AF20-12
Required Crew: 2-3 Required
Concrete: 6-9, 80 lb. bags
Required Tools:
● Wheelbarrow
● Step Ladder (6’ or taller)
● Shovel
● Tape Measure
● Digging Bar or Pick
● Level
● Allen Wrench (Provided)
● Open end or Box Wrenches: 9/16”, ¾”
● Hammer or Mallet
● Ratchet Handle & Sockets: 9/16”, ¾”
● Marker Pen
● Drill: Cordless or electric, or impact driver
Component Playgrounds is concerned about the safety of your vision. It
is important that you choose to protect your vision by wearing proper
safety glasses during each and every phase of this construction
process.
PLEASE READ AND UNDERSTAND ALL INSTRUCTIONS BEFORE BEGINNING
The AF20-12 can be installed as a one day project. The normal time
required to install the AF20-12 is about 2-4 hours for a two to three man
crew. This time requirement will vary dependent upon the composition of
the soil and the speed of the installers. Mix and pour the concrete as the
last step.
*Before digging, please obey local laws by notifying your
local underground utilities marking organization*
Summary of Contents for AF20-12
Page 2: ......