Next have three adults stand on opposite ends and stand structure up into
the place you want it to be installed.
Mark holes around a-frame leg, move set to the side of markings and dig holes.
Notice! Most of the “A” frame leg hole needs to be dug towards the inside of the “A”
frame leg.