Two sets of panel clamps
with 2” x 3/8” carriage bolts
and 3/8” nuts
Dig hole 12” x 12”
and add
approximately one
80 lb. bag of
concrete mix
Fire Pole
Barrier
Double Check and Secure:
Make sure to plug the open ends of the floor joist and the top rail with
the plugs provided. Double check and secure any loose set screws or nuts and bolts and enjoy your
Component Playground.
Allow all of the concrete to cure completely before using your
playground. (3-5 days)
.
After concrete has cured, assemble and attach accessories as described below.
8.c. Fire Pole. Dig the hole for the footing about 15” away from the Clubhouse Platform and center the hole
with the desired opening in the barrier. Attach the Fire Pole to the Barrier using two sets of Panel Clamps,
two 3/8” x 2” carriage bolts and two 3/8” hex nuts. Make sure the pole is level. Mix and pour concrete and
allow it to set.