#2 Mark Arch Swing Leg Holes
Mark the position of each leg on the ground below
the top rail and arches assembled previously
#4 Dig Leg Holes for Cementing in the Set
Slide both ends of Top Rail into 9” Socket of
Arch Swing Ends.
Insert and tighten 4 set screws at each end.
#1 Assembling Arch Sections & Top Rail
#3 Assembling Swing Hangers on Top Rail
1.
Set top section aside to complete digging
holes.
2.
Mark and attach swing hangers on top rail.
(See the next page for swing hanger
assembly)