Installation Instructions
1
. Select an area in your yard that is reasonably level and meets the space
requirement for your equipment. Ground Space: 18’ x 12’. Play Space: 22’
x 24’.
2.
Please refer to the top rail assembly sheet and assemble your top rail as
instructed.
3.
Position the top rail (see top rail Assembly page) about 12’ from the
selected spot where you want the unit to finally stand. Using a tape
measure and marker, mark location of the swing hangers and the ladder
along the top rail. (see top view on assembly and installation instructions or
measurements)
4
. Assemble swing hangers (see swing hanger assembly sheet) and attach
securely to the top rail.
5.
Using the hammer, install the plug into the open end of the top rail.
6.
Locate position in your yard where the upright ladder will stand. Dig the
hole for the ladder (see installation instructions page #1). Lay the ladder
onto the ground with the bottom of the ladder laying just over the hole
where it will finally stand. Hint: Be sure to situate the ladder so that when
the unit is finally standing the rungs and the third leg bolt will be facing as
desired in your space.
7
. Turn the top rail onto its side on the ground. Slide the top rail into the
sleeve at the top of the ladder and position it to the marks previously made.
(see Installation Instructions page #3). Loosely install set screws into the
top of the ladder sleeve. Bolt “A” frame legs into place. (see installation
instructions page #2)
8.
Using two strong adults, stand the swing frame up, allowing the ladder to
fall into the hole previously dug. (Note: set will not be level at this point.) At
this point, check to make sure that the top rail is still in its proper place
inside the ladder top sleeve. Adjust as necessary by holding onto the
ladder securely and pushing or pulling the “A” frame section causing the
top rail to slide inside the top sleeve. When you are satisfied that the top
rail is in the proper position, securely tighten the set screws in the top
sleeve of the ladder.