9.
With the ladder still standing in its hole, situate the “A” frame end to the
desired position in the play area. Determine location of the “A” frame legs
and mark the holes. Move the legs out of the way and dig the holes. (Keep
most of the hole to the inside of the leg). Place the legs into the holes.
10.
Level the set.
11
. Slide 3rd leg sleeve onto the top rail that is sleeved into the outside of
the 10’ ladder.
12.
Measure 5 1⁄2’ - 6’ away from the 10’ Upright Ladder to mark and dig
the hole for the Third Leg (see #1B hole sizes for cementing).
13.
Before installing the third leg, locate the third leg. Insert 3⁄8” x 31⁄2” Hex
Bolt and loosely thread 3⁄8” Nut into the bottom hole. Nut will not thread all
the way on and bolt will be loose. (This is to act as an anchor in the
concrete and does not need to be tight.)
14.
Install Third Leg by dropping the end into the hole and sliding the top
into the 3rd leg sleeve. Use the 3/8” x 2 3/4” hex bolt and 3/8” nyloc nut.
Then secure 3rd leg with set screw on under side. (see installation
instructions page #4) When properly positioned, secure the set screws in
the top of the 3rd leg sleeve.
15.
Mix concrete according to package directions and pour into the holes.
(See Installation Instructions page #1) You will use approximately 6-7 80
pound bags in the ladder hole and 1 1⁄2 bags in each of the leg holes.
16.
Allow the concrete to cure completely before you use your swing set
(3-5 days).
17
. Assemble and attach the Buoy Ball swing.
18
. Attach chains and swing seats and enjoy your Component Playground!