background image

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Model MT32-10 

Continued 

Installation Instructions 

Holes 28”x20”x24” 

(approx. 6-7  80 lb bags of 

concrete mix) 

 

(A)

 

Upright Ladder 

24” 

20” 

28” 

(B)  A Frame Legs  

Holes 18” wide x 12” deep 

(approx. 1 ½ 80 lb bags 

concrete mix per hole.) 

12” 

18” 

#1 Hole Sizes for Cementing in the Set 

#2 A Frame Leg Assembly 

3/8” x 2 ¾” Hex Bolt 

with 3/8” Nyloc Nut  

(1 each per leg) 

3/8” x 3/8”  

Set Screw  

(1 each per leg) 

Slide in leg, bolt in 

place and secure 

with set screw 

A Frame 

Leg 

Triple 

End 

(C) Third Leg 

Hole 18” wide x 18” 

deep (Approx. two 80 lb. 

bags of concrete) 

Top rail to laddery assembly 

Summary of Contents for MT32-10

Page 1: ...y of the receipt with wording such as missing xyz part etc Note some shipments will have more than one pallet so check both before noting missing 4 Similar to 3 above also note the condition of the pi...

Page 2: ...Quantity Description 1 Box Containing Swing Set Parts 2 1 7 8 X 11 Leg 1 2 3 8 x 11 7 Top rail 1 1 7 8 x 13 Third Leg 1 10 Upright Ladder Actual Length 12 1 Slide 1 Triple End with Sleeve 1 2 3 8 x 5...

Page 3: ...the three swing hangers that will be on the inside of the ladder and the A frame legs 5 Using the hammer install the plug into the open end of the top rail 6 Locate position in your yard where the upr...

Page 4: ...5 6 away from the 10 Upright Ladder to mark and dig the hole for the Third Leg see 1B hole sizes for cementing 13 Before installing the third leg locate the third leg Insert x 3 Hex Bolt and loosely...

Page 5: ...l Assembly process Refer to spacing diagram and graphic found above Step 3 Insert and tighten 4 3 8 x 3 8 set screws into each of the Triple End Sleeves using Allen Wrench provided Step 4 Slide smalle...

Page 6: ...Two piece Top Rail Assembly Make sure to line up the set screws so they make a straight line as show in the graphic above Step 1 Step 2 Step 3...

Page 7: ...Model MT32 10 GROUND SPACE 19 X 15 MINIMUM RESIDENTIAL PLAY SPACE 23 X 26...

Page 8: ...approx 1 80 lb bags concrete mix per hole 12 18 1 Hole Sizes for Cementing in the Set 2 A Frame Leg Assembly 3 8 x 2 Hex Bolt with 3 8 Nyloc Nut 1 each per leg 3 8 x 3 8 Set Screw 1 each per leg Slid...

Page 9: ...eve 3rd Leg Nyloc Jam Nut Insert 3 8 x 3 8 and 3 8 x Set Screw and tighten to help secure the 3rd leg in place Slide x 2 bolt through the two holes and secure with the 3 8 nyloc jam nut Tighten 3 8 x...

Page 10: ......

Page 11: ...ut in place 2 Attach the slide to the bracket by placing the slide in place on bracket Then drilling with a 3 8 drill bit through the holes in the bracket into the slide Holes in the bracket should li...

Page 12: ...ards in this type of equipment when used improperly Children should be instructed as to proper caution to take in its use Equipment should NOT be used when it is wet or icy Equipment should only be us...

Page 13: ...rdware stores and at Component Playgrounds The brass bushings inside of the swing hanger are impregnated with lubricant and will not generally require any further lubrication However these should be p...

Page 14: ...ife expectancy of the vinyl canopy is 3 5 years 7 Swing Seats These should be inspected at least twice annually and should be replaced as necessary 8 Slides Slides should never be lifted at the bottom...

Page 15: ...le helmets when using playground equipment 4 Remove drawstrings from hoodie s and jackets Remove attached mittens and gloves These can become entangled with the equipment and present the risk of stran...

Page 16: ...cover damage resulting from flood fire catastrophe or other acts of nature To the extent permitted by law Component Playgrounds shall not be liable for any direct indirect special incidental or conseq...

Page 17: ..._____ CUSTOMER INFORMATION Project Name _______________________________________ Contact Person _____________________________________ Address ___________________________________________ City __________...

Reviews: