background image

you are satisfied that the top rail is in the proper position, securely tighten the set 
screws in the top sleeve of the ladder. 

9. With the ladder still standing in its hole, situate the “A” frame end to the desired 

position in the play area. Determine location of the “A” frame legs and mark the 
holes. Move the legs out of the way and dig the holes. (Keep most of the hole to the 
inside of the leg). Place the legs into the holes.  

10. Measure from about the middle of the outrigger to the ground. This measurement 

should be 10’. Determine the level of the swing set by using the level along the 
length of the top rail. Remove from, or add soil to the holes as necessary to put the 

unit to the correct height and to make it level.  

11. Slide 3rd leg sleeve onto the top rail that is sleeved into the outside of the 10’ 

ladder. 

12. Measure 5 ½’ - 6’ away from the 10’ Upright Ladder to mark and dig the hole for 

the Third Leg (see #1B hole sizes for cementing).  

13. Before installing the third leg, locate the third leg. Insert ⅜” x 3½” Hex Bolt and 

loosely thread ⅜” Nut into the bottom hole. Nut will not thread all the way on and 

bolt will be loose. (This is to act as an anchor in the concrete and does not need to 
be tight.)  

14. Install Third Leg by dropping the end into the hole and sliding the top into the 3rd 

leg sleeve. Use the 3/8” x 2 3/4” hex bolt and 3/8” nyloc nut. Then secure 3rd leg 
with set screw on under side. (see diagram #4) When properly positioned, secure 
the set screws in the top of the 3rd leg sleeve. 

15. Determine location of turning bar hole by placing the turning bar up to the ladder. 

Mark and dig the hole. Attach the turning bar to the ladder. Check and adjust the 
level of the turning bar. (See #4 fire pole and turning bar assembly.) 

16. Attach Slide bracket to Ladder (See slide assembly sheet) and attach slide to 

bracket as instructed. 

17. Mix concrete according to package directions and pour into the holes. (See 

Installation Instructions page #1.) You will use approximately 6-7 80 pound bags in 

the ladder hole and 1 ½ bags in each of the leg holes. 

18. Allow the concrete to cure completely before you use your swing set (3-5 days).  
19. Attach chains and swing seats and enjoy your Component Playground. 

 

Summary of Contents for MT40-10

Page 1: ...and attach securely to the top rail 5 Using the hammer install the plug into the open end of the top rail 6 Locate position in your yard where the upright ladder will stand Dig the hole for the ladde...

Page 2: ...g Insert x 3 Hex Bolt and loosely thread Nut into the bottom hole Nut will not thread all the way on and bolt will be loose This is to act as an anchor in the concrete and does not need to be tight 14...

Page 3: ...l Assembly process Refer to spacing diagram and graphic found above Step 3 Insert and tighten 4 3 8 x 3 8 set screws into each of the Triple End Sleeves using Allen Wrench provided Step 4 Slide smalle...

Page 4: ...Two piece Top Rail Assembly Make sure to line up the set screws so they make a straight line as show in the graphic above Step 1 Step 2 Step 3...

Page 5: ...Model MT40 10 GROUND SPACE 19 X 15 MINIMUM RESIDENTIAL PLAY SPACE 23 X 26...

Page 6: ...x Bolt with 3 8 Nyloc Nut 1 each per leg 3 8 x 3 8 Set Screw 1 each per leg Slide in leg bolt in place and secure with set screw A Frame Leg Slide Top Rail joint into place about 1 inch inside the Lad...

Page 7: ...d 3 8 x Set Screw and tighten to help secure the 3rd leg in place Slide x 2 bolt through the two holes and secure with the 3 8 nyloc jam nut Tighten 3 8 x set screws on the top sleeve of the ladder 2...

Page 8: ...Note We recommend you check the pendulum in the swing hangers at least every 6 months for normal wear...

Page 9: ...Bar on the Upright Ladder Leg Determine location of hole and dig hole as shown below Clamp Fire Pole or Turning Bar into position level and cement in ground Turning Bar Fire Pole Turning Bar Tighten u...

Page 10: ...ut in place 2 Attach the slide to the bracket by placing the slide in place on bracket Then drilling with a 3 8 drill bit through the holes in the bracket into the slide Holes in the bracket should li...

Page 11: ...ards in this type of equipment when used improperly Children should be instructed as to proper caution to take in its use Equipment should NOT be used when it is wet or icy Equipment should only be us...

Page 12: ...rdware stores and at Component Playgrounds The brass bushings inside of the swing hanger are impregnated with lubricant and will not generally require any further lubrication However these should be p...

Page 13: ...ife expectancy of the vinyl canopy is 3 5 years 7 Swing Seats These should be inspected at least twice annually and should be replaced as necessary 8 Slides Slides should never be lifted at the bottom...

Page 14: ...le helmets when using playground equipment 4 Remove drawstrings from hoodie s and jackets Remove attached mittens and gloves These can become entangled with the equipment and present the risk of stran...

Page 15: ...cover damage resulting from flood fire catastrophe or other acts of nature To the extent permitted by law Component Playgrounds shall not be liable for any direct indirect special incidental or conseq...

Page 16: ...INFORMATION Project Name _______________________________________ Contact Person _____________________________________ Address ___________________________________________ City ____________________Stat...

Reviews: