**Important Notice! Please read and understand prior to proceeding**
Pre-Assembly: Assembling the Play House Floor Joists
2.a. Locate the Floor Joist End with the four holes in it as shown below and determine which holes you
will be using for your particular swing set configuration. This is the end that will bolt to the vertical
ladder.
Determine which holes you will be using by identifying the configuration below
that most closely resembles the configuration you wish to achieve.
After configuring your swing
set, plug unused holes with ½”
plugs provided.
OR
2.b. Assemble the Deck Floor Joist structure as shown below using (8) set screws. Make sure that the set
screw holes are facing inward as shown below.
Summary of Contents for PH30-10
Page 26: ......