4.c. Using two strong adults lift the ladder and the post end and allow them to fall not the previously
dug holes. You can allow the structure to stand it will not be level at this time.
4.b. Having pre-assembled the floor joist system, it is now best to have at least three people to
assemble the Play House Legs to the floor Joists. Insert all four legs. Then insert and secure one set
screw into each leg to hold them in place. *Note: We suggest you use a structure of some kind to
support the platform as you place the assembled deck structure in the previously dug holes as
shown. (see suggestion below.)
**Notice top rail should
be flush with end of
ladder top sleeve.
Jack stands or
structure to
support platform