#1 Hole Sizes for Cementing in the Set
Hole 28”x20”x24”
(approximately 7 80 lb.
bags of concrete mix
per hole)
DO NOT USE POSTMIX USE GOOD QUALITY CONCRETE MIX!
(B) A-Frame
Legs
Holes 18” x 12”
(approximately
1½ 80 lb. bags
concrete mix
per hole)
(A) Upright
Ladder
28”
24”
20”
3/8” x 2¾” Hex Bolt
with 3/8” Nyloc Nut
(1 each per leg)
3/8” x 3/8”
Set Screw
(1 each per leg)
Slide in leg, bolt in
place and secure
with set screw
#2 A-Frame Leg Assembly
#5 Ladder to Top Rail Assembly and
Attaching the Third Leg
#3 Ladder to Top Rail Assembly
8’
Ladder
Top Rail
Slide Ladder in
place on Top Rail
and secure with
two 3/8” x 3/8” set
screws.
©2007 Swings & Things Inc.
(C) 3rd Leg
Hole 18” x 18”
(approximately
2 80 lb. bags of
concrete mix)
#4 Horizontal Ladder to Upright Ladder Assembly
Set Screw
Top Rail
Upright Ladder
Adjustable Sleeve
Horizontal Ladder
Set
Screws
Set Screws
A-Frame
Leg
Triple End
Top Rail
10’
Ladder
Place
3rd Leg
over
Bolt &
secure w/
3/8”
Nyloc Nut
Slide Ladder in
place on Top Rail
and secure with
two 3/8” x 3/8”
set screws.
Please Note: Only the 10’ Side requires a Third Leg
Model SS36-10 Continued