4
Compulite
Chapter 1
Setting up Vector
1.
Place the console on a clean, stable, and level surface.
2.
Make sure the voltage selection switch, located on the power supply,
is correctly set to 230V AC or 110V AC.
3.
Connect the Vector to the mains supply using the cable supplied.
4.
Connect any peripherals to their connectors on the back panel. All
connectors are labeled with names and standard icons.
5.
Switch on the power, using the switch located on the power supply
on Vector’s back panel. The soft switch located on the front of the
console is lit.
6.
Open the door protecting the soft switch, on the front of the
console, and press the switch once. Wait for Vector to complete boot
up.
7.
Connect the DMX cables to the appropriate ports.
IMPORTANT!
It is strongly recommended to use a UPS (minimum
600VA) to protect your work and the console.
To shutdown Vector
1.
Press the soft switch located on the front of the console.
2.
Tap
Turn Off
in the
Turn Off Computer dialog
box.
Vector shuts down.
Summary of Contents for Vector Ultra Violet
Page 1: ......
Page 6: ...vi Compulite ...
Page 8: ...2 Compulite ...
Page 44: ...38 Compulite Chapter 2 ...
Page 72: ...66 Compulite Chapter 3 ...
Page 90: ...84 Compulite Chapter 4 ...
Page 104: ...98 Compulite Chapter 5 Figure 30 Master playback or AB display PB tab Figure 31 Cue sheet ...
Page 120: ...114 Compulite Chapter 6 ...