background image

Sentinel 150P installation, operation & maintenance 

ci0050   p8/8   issue 5   2014-08-26 

 

 

 

 
 

Fault Finding, Warranty and Maintenance 

Troubleshooting Flowchart: 

 

Summary of Contents for Sentinel 150P series

Page 1: ...change our specifications and designs at any time Computronic Controls products and the Computronic Controls logo are registered and or common law trademarks of Enovation Controls LLC This document i...

Page 2: ...and damage to property ix DANGER OF EXPLOSION NEVER CHARGE A FROZEN BATTERY PRIOR TO INSTALLATION COMMISSIONING Clean battery terminals Be careful to keep corrosion from coming into contact with eyes...

Page 3: ...cover for surface mounting in an enclosed panel Electrical connection of the AC supply battery and control circuits is via screw terminal blocks Model options Model codes with suffix A SNTL150P CDA ad...

Page 4: ...y block for connection of the DC charge output temperature compensation remote sensor relay output and configurable input Use a 5 mm 0 2 in flat head screwdriver to tighten loosen the terminals For th...

Page 5: ...uffix A models SNTL150P CDA additionally include one relay output and one digital switch input The functions of input and output can be configured using the SNTL150P PCSUITE software tool Output The s...

Page 6: ...AWG or larger wire conductors rated for temperature 90 C 194 F The AC live wiring must incorporate fuse ratings types as indicated on the charger labelling Sentinel PC connection SNTL150P PCCON confi...

Page 7: ...ease in output voltage It may be initiated automatically on battery low voltage programmable level factory default 12 0V 24 0V automatically on expiry of a time interval since the last AutoBoost progr...

Page 8: ...Sentinel 150P installation operation maintenance ci0050 p8 8 issue 5 2014 08 26 Fault Finding Warranty and Maintenance Troubleshooting Flowchart...

Reviews: