Hardware Installation
DeviceMaster UP User Guide
: 2000451 Rev. C
- 11
1-Port Installation
5.
Verify that the network connection for the DeviceMaster UP is functioning
properly.
6.
Go to
Configuring the DeviceMaster UP
on Page 19 to install PortVision,
configure the network settings, and upload the appropriate protocol firmware
on the DeviceMaster UP.
Observe proper ESD techniques when
connecting and disconnecting the
DeviceMaster UP.
a.Connect the screw terminal power
connector to the wires on the power supply as
displayed below. If you want to provide your
own power supply, see
.
If you are using the power supply
(optionally) shipped with the
DeviceMaster UP:
•
Red is 5-30VDC positive
•
White is 5-30VDC return
•
Black is earth ground
b.
Use a small flat head screw to lock
the wires into place.
c.
Plug the screw terminal power
connector into the DeviceMaster UP.
Note:
Align the plug properly. The
scalloped side of the screw
terminal power connector
should be aligned with the scalloped side of the power jack on the
unit.
d.
Connect the power supply to a power source.
e.
to verify that the DeviceMaster UP is functioning properly.
LED
Description
Status
The amber
Status
LED on the device is lit, indicating you
have power and it has completed the boot cycle.
Note:
The
Status
LED flashes while booting and it takes
approximately 15 seconds for the bootloader to
complete the cycle.
Link Act
If the red
Link Act
LED is lit, it indicates a working Ethernet
connection.
Duplex
If the red
Duplex
LED is lit, it indicates full-duplex activity.
100
If the red
100
LED is lit, it indicates a working 100 MB
Ethernet connection (100 MB network, only).
Caution
Larger Picture,
Earth Gnd
Return
Positive
5-30VDC
+
-
Wire gauge:
AWG 12-22
Screw Terminal Power Connector