Hardware Installation
DeviceMaster UP User Guide
: 2000451 Rev. C
- 15
Connecting the Power and Verifying Installation
3.
Plug the screw terminal power connector into
JP1
on the DeviceMaster UP by
aligning the scalloped sides.
4.
Apply power to the DeviceMaster UP.
5.
Verify that the network connection for the DeviceMaster UP is functioning
properly.
The LEDs are located between the RJ45 connector and the power terminal
block.
6.
Go to
Configuring the DeviceMaster UP
on Page 19 to install PortVision,
configure the network settings, and upload the appropriate protocol firmware
on the DeviceMaster UP.
LED
Description
Status
When lit, the amber
Status
LED (
D1
) on the
DeviceMaster UP indicates the devices is fully powered
and has completed the boot cycle.
Note:
The
Status
LED flashes for approximately 15
seconds while booting. When the bootloader
completes the cycle, the LED has a solid, steady
light.
Link/Act
When lit, the red
Link/Act
LED (
D2
) indicates a
working Ethernet connection.
Duplex
When lit, the red
Duplex
(
D3
) LED indicates full-duplex
activity.
100
When lit, the red
100
(
D4
) LED indicates a working 100
MB Ethernet connection (100 MB network, only).
LEDs
JP1