Corporate Office: 724.584.5500
Instant Access 24/7 (Parts and Service): 800.458.1960
Parts and Service
:
814.437.6861
45
General Control Operation
System Initialization
Upon power-up, the first screen to appear is the Start-Up Screen as shown in Figure 18. This screen will display
while the Programmable Logic Controller (PLC) and Human Machine Interface (HMI) establish communications.
The PLC/HMI version is located in the lower right hand corner of the screen.
Figure 18 – Start-Up Splash Screen
Once the control communication system has established, the HMI screen automatically switches to the Home
Screen as shown in Figure 19 for water-cooled condenser chillers and Figure 20 for remote air-cooled condenser
chillers.