3
5.6.3
Inserting the CP3 Card
All important operating parameters such as the maximum steam capacity, the heating voltage, the
number of base units as well as the differentiation between main and extension unit are permanently
stored on the CP3 Card.
Before you start the electrical installation,
check whether the CP3 Card is installed
. If it is not,
check
whether the type designation on the CP3 Card supplied corresponds with the type designa-
tion on the data plate of the unit (the data plate is located inside the unit)
. If the designations
match, place the CP3 Card in the card holder on control print . Then cover the data plate inside the
unit beside the type plate with the data plate supplied (self-adhesive).
If the type designation on the CP3 Card and the data plate do not match, the CP3 Card must not be
installed. If this is the case, contact your Condair supplier.
5.6.4
Inspecting the electrical installation
Check the following points:
Do the supply voltages for heating and control comply with the relevant voltages given in the
wiring diagram?
Is the correct CP3 Card inserted?
Are the voltage supplies (heating and control voltage) correctly fused?
Is the service switch “Q..” installed in the supply line for to the heating and control voltage?
Are all components correctly connected according to the wiring diagram?
Are all connecting cables fastened?
Are the connecting cables free of tension (passed through cable glands?)
Does the electric installation meet the applicable local regulations for electric installations?
Is the front panel mounted and correctly fixed with the two screws?