background image

3

IF YOU HAVE THE CONFER CURVE STEP  WITHOUT THE ADD-ON CONTINUE WITH STEP 10. 

IF YOU HAVE THE CONFER CURVE STEP WITH OPTIONAL ADD-ON SKIP STEPS 10-18 AND CONTINUE 
WITH STEP 19.

Tilt the step
backwards to
expose all four
of the rounded
tabs on the bot-
tom edges.

Step 5

Rotate
90°

Install the first tread
[I] by placing over
the tabs on the side
panels as shown.
While holding part
[I] down on the side
panels tap inward
with a rubber 
mallet until locked
in place.

Step 10

Each side panel [A]  
requires 20 lbs of sand 

split between the two fill holes. 
Sand is needed as ballast 
to hold step down in the water.   
Using a funnel fill the lower hole 
completely to the top with sand. 
Shake the panel to help settle the 
sand, lower hole must be 
completely filled. Pour whatʼs left 
from the 20 lbs into the upper 
fill hole. Using provided cap, 
plug the lower fill hole only. 
Upper fill hole must remain open. 
Repeat procedure to fill the
second part [A].

Step 9

Step 7

Determine which
side will be 
facing up on the
front foot pads
[H],  # 1 for a 
flat bottom pool
or # 2 for a pool 
with slight taper
towards the 
center, install
both parts [H]. 

The two back foot
pads [H] will always
be installed with #1
facing up. Place part
[H] over the rounded
tab, strike with a 
rubber mallet until
seated onto the
rounded tab. Repeat
to install second 
part [H]. 

Step 8

SAND

Pour 
sand into
funnel.

Pour 
sand into
funnel.

Repeat step 10 to install
second tread [I].

Step 11

To install the lower
handrail posts [E] first
locate the openings
on part [A] just below
the second tread
marked with #3. Next
insert the tabs on part
[E] all the way into the
openings then tap
down with a rubber
mallet until seated.
Repeat to install the
other part [E].

Step 12

STOP!

STOP!

Installing the
Foot Pads [H]:

If swimming
pool has a flat
bottom, all four
foot pads [H] will be installed with the #1 facing up.
If swimming pool has a slight taper towards the
center, the back foot pads will be installed with #1
facing up and the front foot pads with #2 facing up.

Step 6

#1

#2

prpd.Confer-CurveStepIGr16:Confer-Step-1_R1  1/3/13  2:26 PM  Page 3

Summary of Contents for CCX-IG

Page 1: ... CURVE STEP IN GROUND CURVE STEP SYSTEM ASSEMBLY AND INSTALLATION MANUAL Made in the U S A by www conferladders com Model CCX IG Note 40 lbs of sand required Model CCX IG System Note 70 lbs of sand required SAND prpd Confer CurveStepIGr16 Confer Step 1_R1 1 3 13 2 26 PM Page 1 ...

Page 2: ...te assembly The Curve Step with optional add on requires a total of 70 lbs of sand Choose a location close to the swimming pool for assembly Hardware Pack 2 Plugs WG 8 10 x 1 1 4 screws 2 Labels No Jumping Diving Hardware not provided to fasten step to concrete Purchase locally Needed for Assembly Rubber mallet Funnel Cordless Drill Phillips screwdriver Liquid soap or lubricant Sand 40 lbs for Cur...

Page 3: ...nd part A Step 9 Step 7 Determine which side will be facing up on the front foot pads H 1 for a flat bottom pool or 2 for a pool with slight taper towards the center install both parts H The two back foot pads H will always be installed with 1 facing up Place part H over the rounded tab strike with a rubber mallet until seated onto the rounded tab Repeat to install second part H Step 8 SAND Pour s...

Page 4: ...ws through the deck connectors and into the posts If you have a wood deck attach the deck connectors to the pool deck using 2 10 x 1 1 4 screws in each connector If your pool deck is concrete consult with your local hardware store for the proper anchors and screws With a helper place the pool step into swimming pool Hold the step under water at a slight angle until all the air bubbles stop Tilt th...

Page 5: ...d H on to the bottom of the tread support N by placing over the raised tab and striking with a rubber mallet until seated Foot pad H should be installed in the same position as the front foot pads on base step Step 23 Locate the notch on the bottom edge of the large flex riser M Slide the step support N under then rotate up making sure part is in notch Step 24 5 S L K J R Q P M H N O Additional Pa...

Page 6: ...UCTIONS Cont d At this time add 30 lbs of sand through the two fill holes located on the add on panel Using a funnel fill the lower hole com pletely to the top with sand Shake the panel to help settle the sand Lower hole must be completely filled Pour whatʼs left from the 30 lbs into the upper hole Using provided cap plug the lower fill hole only Upper fill hole must remain open Step 25 The next s...

Page 7: ...st and attach the same as in step 32 Step 36 Install the lower and upper handrail posts E to the left side panel by repeating steps 12 and 13 Step 37 Repeat step 14 to install the top tread 1 3 Step 38 Place both deck con nectors F over the upper handrail posts and slide down Check to make sure the side marked this side down is facing downward Step 39 Place handrails G over the top of handrail pos...

Page 8: ...e unit can be removed by both people standing on the deck and lifting and tilting the unit to drain some of the water from the steps After the unit is light enough carefully lift it from the pool CAUTION POOL STEP WILL BE HEAVY PLEASE HAVE ADDITIONAL HELP WHEN REMOVING FROM SWIMMING POOL DO NOT ATTEMPT TO REMOVE STEP BY YOURSELF The Confer Curve Step can be covered if desired and stored outdoors P...

Reviews: