Xtreme/GbE 24-Port - Managed Carrier Ethernet Switch
Users Guide
Document: CTIM-00455
Revision: 0.04
Page 31 of 46
Connect Tech Inc. 800-426-8979 | 519-836-1291
Date: 2017/08/04
Hardware Usage Examples
Typical Installation Procedure
1. Ensure all external system power supplies are off.
2. Connect any Breakout Boards or external port cabling
3. Ensure voltage is in the range of +4V to +14V
4. Turn on external power supply
5. XDG will now boot up
6. It will default to an “unmanaged” mode where all ports are switched to all ports.
XDG025 (Standalone Application)
XDG025 mated with Breakout Board with Vertical Connectors
XDG025 mated with Board-to-Cable Assemblies
XDG025 mated with Breakout/ “Carrier” Board with Right Angle Connectors
(XHG102)
(XHG102)