background image

7

 - Setting Fiber on the Fiber Holder

 

 

 

           C

Close the front cover

 

 

 

            D

11

  - Remove the Wedge

12

 - Open the Front and Back  Cover

13

 - Take out Connector

14

  - Fitting Boot

8

  - The Fiber Cleaver

9

  - Checking Cut Dimension

5

  - Cleaning Bare Fiber

6

  - Screening Fiber

2

  - Setting Connector

3

 - Install boot onto fiber as shown

4

  - Removing 0.9 Wire Coating

A

Grip

B

15

 -  Completion

1

 -  Preparing Connector

A

B                             Open the lock lever

10

  - Inserting Fiber

 

 

 

           C

1. Open the middle cover 

 

 

 

           D

Small amount of bending is normal 

Be sure to wear Safety Glasses

2  -  Set circular groove of connector  
tightly onto semicircular ridge  “U” 
shaped shelf of Jig.
Make sure there is no space between the 
wedge and the connector, if there is, re-
align the products before proceeding.

Approxima

tely 30 mm

4 A  -   Remove 0.25 mm or 0.9 mm fiber
jacket remover. coating, using 
appropriate fiber jacket remover. 

4 B  -  Removing appropriate length of 
the fiber jacket

Pull

5  -  DO NO T USE DIRTY GAUZE!

6 - Bend fiber several times by moving it 
with your  finger back and fourth. 
IF FIBER BRAKES, START WITH A
NEW FIBER FROM THE BEGINNING.

7B - When fully pushed forward guide
 member should not be visible from the
 back end of the fiber holder

7D - SET THE FIBER ALONG THE GROOVE
TIGHTLY BEFORE CLOSING  THE BACK COVER.

8  -   A -  Insert  slider

B - Set the fiber holder to the Cleaver
C - Set the fiber holder tightly
D - Push the cover of  the Cleaver

SET THE FIBER HOLDER TIGHTLY!

A

B

C

D

10A -  Set the fiber holder to the guiding rail
10 B -  Slide holder slowly until it is stopped.
BE CAREFUL NOT TO HIT THE EDGE OF FIBER!
10C  -  See diagram
10D -  CHECKING WHETHER THE FIBER IS
BENDING OR NOT (IMPORTANT)!

Guiding Rail

Length of bare fiber: 9~11 mm

CLICK!

Push the arm to remove the wedge

PULL OUT WEDGE AND OPEN COVER.

CLICK!

IF OUT OF TOLERANCE,
REWORK  FROM
PROCEDURE(4)!

Close the cover in the order of above

LENGTH OF 0.9 BUFFER IS WITHIN 2 MM !

<2mm

1

2

3

X

Clean bare fiber with a lint-
free Gauze  Pad moistened 
with pure Alcohol

X

up

down

left

               right

     30

o

degree

GUIDE MEMBER MUST BE PUSHED AS
FAR FORWARD AS POSSIBLE.

2. Insert until sounding click

Reviews: