OPERATING & INSTALLATION INSTRUCTION 2-POST-LIFT
If the lift is set up by the operator himself, the attached assembly and operating instructions must
be observed. Subsequently the lift must be subjected to safety acceptance by a Consul customer
service section. This includes the following performances:
Electrical functional check and trial run.
according to BGG 945
examination of the individual structural components.
Entry in the check list.
Short instruction.
-If these points are not observed, the guarantee expires.-
7. Annual expert check (UVV)
In addition to the check prior to the initial commissioning of the lift by our customer service section,
the official regulations demand at least one safety acceptance per year experts. Our customer
service section will be pleased to submit you a quotation for a maintenance contract.
8. Assembly cost rates and invoicing
The performances of the customer service section stated are invoiced in accordance with the
respectively applicable terms and conditions of assembly, hourly rates and lump-sum travelling
amounts. Securing material is not included in the scope of delivery of the lifts.
9. Guarantee
On the basis of the fact that lifts must satisfy hight safety requirements for the protection of the
persons working on them, we draw your attention to the fact that we must tie the guarantee
entitlement of the operator to the correctly performed safety acceptance and entry of this in the
check list. Always uses original spare parts. The use of any other parts invalidates the design
permit and all claims under warranty.
Service memorandum standard fundaments
Individual fundaments:
Concrete floor
(hall floor)
Type: Fundament
dimensions
Fundament characteristics
Length
in
direction of travel
Width in
direction of
travel
Min, thickness
without floor
covering
Quality of
concrete
Anchoring
depth
dowels
*
Consul 2.25 RMC
150 cm
350 cm
15 cm
B25
11 cm
Consul 2.30 Modula
120 cm
100 cm
21 cm
B 25
13 cm
Consul 2.30 Modula EL
120 cm
100 cm
21 cm
B 25
11 cm
Consul 2.35 Modula
120 cm
100 cm
21 cm
B 25
13 cm
Consul 2.35 Modula EL
120 cm
100 cm
21 cm
B 25
11 cm
Consul 2.40 Modula EL
120 cm
100 cm
21 cm
B 25
13 cm
Consul 2.60 2M
150 cm
350 cm
21 cm
B 25
10 cm
Consul 2.60 2M GF/EL
150 cm
150 cm
21 cm
B 25
10 cm
Prolift 3003 GA
120 cm
100 cm
18 cm
B 25
13 cm
Prolift 2.30 EL
120 cm
100 cm
21 cm
B 25
11 cm
Prolift 2.40 EL
120 cm
100 cm
21 cm
B 25
13 cm
The setting up of the lifts is only admissible and will only be carried out if the minimum requirement on the
fundaments indicated are fulfilled at the place of setting up.
see page 6
*
in the respect the information of the dowel manufacturers is binding!
subject to change without prior notice!
Page 5
Summary of Contents for 2.25 EMC
Page 67: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Electric diagram H342 Page 67 ...
Page 68: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Electric diagram H325 Page 68 ...
Page 70: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Electric diagram with push button Page 70 ...
Page 71: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 71 ...
Page 72: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 72 ...
Page 73: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 73 ...
Page 74: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 74 ...
Page 75: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 75 ...
Page 76: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 76 ...
Page 77: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 77 ...
Page 78: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 78 ...
Page 79: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 79 ...
Page 80: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 80 ...