OPERATING & INSTALLATION INSTRUCTION 2-POST-LIFT
Important notice:
If you encounter big differences in voltage or any other problems, it might happen that the main board is shut
down automatically for safety purpose. In this case the lift cannot be operated. To make it work again, this
can be done usually by turning the main switch on and off again.
white
brown
green
white
brown
green
potentiometer
Lifting screw
with threat
The path pick-ups P1 and P2 are not marked on the lift. The configuration of the components corresponds to this drawing. The
wiring of the path pick-ups must be carried out according to the colour scheme of the prescribed plan. Incorrect wiring upsets
the path pick-ups!
When fitting a new EEPROM or circuit board or in the event of any interruption to
the control sequence which cannot be dealt with, carrying out the following steps
will help!
How to active the EEPROM
1.
Main switch off
2.
Jumper on both plugs
3.
Main switch on
4.
Jumper on one plug or put it away until end of this process
5.
Main switch off
6.
Main switch on
7.
The control is actived by turning the code switch to 8 and pushing the Enter button
Test connections, signal and EEPROM (Saving)
(Carriages are not near the end stops)
1.
Turn switch to code 8.
2.
Push ENTER button
3.
LED 2 is blinking (green), the signal is on.
4.
Turn the „up“ switch until the carriages start to move up.
5.
The lift will move a short distance upwards.
6.
LED 1 is blinking (green), the signal is on.
7.
Turn the „down“ switch until the carriages start to move down.
8.
The lift will move a short distance downwards.
9.
If the test has been successfull, both LED are blinking green.
10. If any fault accured, both LED are blinking red.
11. Push ENTER button (EEPROM-Test)
12. If everything is ok, both LED are green.
13. If the electronic encounters have any problems, both LED are blinking red, the signal is on. To rectify the fault, the lift has to be
turned off. The jumper on the main board has to be put onto both connections, turn main switch on. After that turn off main switch
again, put the jumper onto one connection only and turn main switch on again.
14. Set code switch to any mode.
15. Push
ENTER
Page 47
Summary of Contents for 2.25 EMC
Page 67: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Electric diagram H342 Page 67 ...
Page 68: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Electric diagram H325 Page 68 ...
Page 70: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Electric diagram with push button Page 70 ...
Page 71: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 71 ...
Page 72: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 72 ...
Page 73: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 73 ...
Page 74: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 74 ...
Page 75: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 75 ...
Page 76: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 76 ...
Page 77: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 77 ...
Page 78: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 78 ...
Page 79: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 79 ...
Page 80: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 80 ...