CONTRACOR
®
ECO-series pressure blast cabinets
29
the window frame. To replace the window pane, loosen these four screws, and remove the
window frame. Inspect the gaskets for damage. If either gasket is damaged, replace as per
section 5.2.5.
Take out the old window by pulling on the window molding.
The window molding can be installed in the window opening by placing the narrow slit of
the molding over the metal edge of the opening. The ends of the molding should meet in the
middle of the straight section of the opening. Press on the molding so that the ends are tightly
sealed. Insert the view window into the wide slit of the molding while working from the front.
5.2.5 Window Gasket Replacement
At the first sign of media leakage around the view window,or if gaskets seem to
be damaged, the window frame gasket and cabinet window opening gasket need to be
replaced.
Inspect the gaskets when replacing the view window. Take out the viewing window
and window frame according to Section 5.2.4. Take out the old gasket material completely
and clean all surfaces of the cabinet and window frame.
Pic. 5.2.4.2
. Viewing
window replacement
Pic. 5.2.4.1
. Windows
frame removal
Summary of Contents for ECO-100P
Page 151: ......