61
GB
Screw the brackets into place on the lower front stone with 4
concrete screws (Ø6x30). Check that the distance between the
outside edges of the brackets is 500 mm.
500 mm
Remove the lower front section. Lift up the front stone and slide
it into place. The brackets should be held in place between the
lower side stones and the metal panels. Fit the front stone to
the stove body with two socket head screws (M5x12). All that is
needed is a slight turn of the screws.
Place the six olivine blocks on top of the fire-box as shown above.
Fit the screen, top grille and top stones. If the stove has a rear
flue connection, place the covering plate on top of the top grille.
NOTE!
If a fan is to be installed on the stove, this must be
done before the lower front stone is fitted
(see page 62).