A1000 INSTALLATION, OPERATION, & MAINTENANCE MANUAL
February 2016 | 256574-ENG
R01 2-9
2.3 Plant Growth – PG Kit
Depending on order options, the chamber may be delivered with the kit installed. The kit is easy to
install using only a Phillips screwdriver.
2.3.1 PG Kit Parts List
Item Qty.
Description
Photo
A 1
Back Wall Plenum Bottom
Support
B
1
Back Wall Plenum
C
24
Screw M4 x 8mm, Pan Head
D
8
Screw M3 x 40mm, Pan Head
E
2
Canopy Cooling Fan
F
2
Cooling Fan Wiring Harness
G 1
AC/DC
Converter
H
2
Screw, M3 x 16mm, Pan Head
Ensure at least 4” (100mm) of free space around the exterior side walls of the
chamber to facilitate proper air circulation. Inadequate air circulation and cooling
inside the chamber will result if this space is not provided.
Summary of Contents for ADAPTIS A1000
Page 1: ...A1000 INSTALLATION OPERATION MAINTENANCE MANUAL 256574 ENG R01 ...
Page 14: ...Precautions 1 4 February 2016 256574 ENG R01 ...
Page 46: ...Kit Installation 2 32 February 2016 256574 ENG R01 ...
Page 54: ...Chamber Start Up and Operation 5 4 February 2016 256574 ENG R01 ...
Page 63: ......