A1000 INSTALLATION, OPERATION, & MAINTENANCE MANUAL
February 2016 | 256574-ENG
R01 2-15
2.3.2.4 Installing the Back Wall Plenum
The back wall plenum directs airflow
down towards the Unifloor™.
To install the back wall plenum:
1. Remove the rubber instrumentation
port plug from the inside wall and
temporarily re-install it in the port on
the outside wall.
2. With the plenum handle at the top,
gently slide the back wall plenum,
Item B, into the chamber.
3. Position the plenum at a slight angle
to clear the protruding lamp
receptacles and the aspirator and
push it into place against the chamber
back wall.
4. Engage the locating pins above the
handle on the top of the plenum into
the holes in the top of the chamber.
5. Secure the plenum to the chamber
with twelve (12) screws, Item C
(Figure 2-16).
a. Install the eight (8) vertical screws
loosely to hold the plenum in
place.
b. Gently pry the back wall plenum
upwards to align the four (4)
bottom holes in the plenum with
the holes in the bottom support
and install the screws.
c. Tighten all screws to full
resistance.
Figure 2-16
PG Back Wall Plenum Installed
B
C
Aspirator
Rubber Plug
Lamp
Receptacles
Summary of Contents for ADAPTIS A1000
Page 1: ...A1000 INSTALLATION OPERATION MAINTENANCE MANUAL 256574 ENG R01 ...
Page 14: ...Precautions 1 4 February 2016 256574 ENG R01 ...
Page 46: ...Kit Installation 2 32 February 2016 256574 ENG R01 ...
Page 54: ...Chamber Start Up and Operation 5 4 February 2016 256574 ENG R01 ...
Page 63: ......