A1000 INSTALLATION, OPERATION, & MAINTENANCE MANUAL
February 2016 | 256574-ENG
R01 2-19
2.3.2.7 Installing the Wire Shelf
The wire shelf can be installed in any
position within the chamber, depending
on the experiment requirements.
However, the shelf must be installed in
the lowest position if maximum plant
height growth is required within the
chamber.
To install the wire shelf:
1. Place the four (4) bottom shelf
supports, Item M into the slots in the
side wall by inserting the top part of
the clip into the desired slot and press
lightly on the bottom to snap it into
position.
2. Place the wire shelf with the lamp
supports, Item N, over the clips
(Figure 2-22).
The chamber is now ready to operate.
Read the startup instructions carefully
before proceeding with the start up.
Figure 2-22
PG Wire Shelf Supports Detail
Figure 2-23
PG Kit Installed
N
M
The maximum operating levels of light for this kit must be set at the controller. To edit
the factory default setting, refer to the included controller Operator’s Manual.
Summary of Contents for ADAPTIS A1000
Page 1: ...A1000 INSTALLATION OPERATION MAINTENANCE MANUAL 256574 ENG R01 ...
Page 14: ...Precautions 1 4 February 2016 256574 ENG R01 ...
Page 46: ...Kit Installation 2 32 February 2016 256574 ENG R01 ...
Page 54: ...Chamber Start Up and Operation 5 4 February 2016 256574 ENG R01 ...
Page 63: ......