Chamber Installation
4-2 February 2016 | 256574-ENG
R01
4.2 Leveling the Chamber
The A1000 is equipped with four (4) levelers to prevent the unit from rolling on its casters once
installed, and to compensate for any variations in the floor level (Figure 4-5). The levelers are M24
x 120mm bolts inserted at the four corners at the bottom of the base. The unit must be tilted or
lifted in order to thread the bolts in.
The levelers must be adjusted to take the weight of the unit off the casters. Once the chamber is
moved into position, adjust the levelers until they are in firm contact with the floor and the
chamber is level.
To adjust the levelers:
1. Turn the levelers under the back wall
of the chamber clockwise until they
are in firm contact with the floor.
2. Adjust the levelers on the side walls
until the gap between the caster and
the floor is at least 1/8” (3mm) and no
more than 1/4” (6 mm), as shown in
Figure 4-5.
3. It is important that the two front
levelers are perfectly level (side to
side) so the door closes easily. An
out-of-level condition on the front
levelers can cause the door to bind
due to misalignment.
4. Ensure the chamber is level in both
the side to side and front to back
directions for proper drainage.
5. Turn the upper locknut
counterclockwise until it is tight
against the chamber frame to secure
the levelers in position (Figure 4-6).
Figure 4-5
Chamber Levelers
Figure 4-6
Tighten the Locknut
4.3 Installing the Drip Pan
Slide the plastic drip pan between the metal runners located under the center of the chamber.
1/8” (3mm) to 1/4” (6 mm) above the floor
Summary of Contents for ADAPTIS A1000
Page 1: ...A1000 INSTALLATION OPERATION MAINTENANCE MANUAL 256574 ENG R01 ...
Page 14: ...Precautions 1 4 February 2016 256574 ENG R01 ...
Page 46: ...Kit Installation 2 32 February 2016 256574 ENG R01 ...
Page 54: ...Chamber Start Up and Operation 5 4 February 2016 256574 ENG R01 ...
Page 63: ......