31
Building Considerations
Penetration Through Fire-Rated
Assemblies
Any piping that needs to penetrate fire-rated
assemblies needs to be prepared/finished in
line with any relevant regulations.
Roof Penetration
Depending on the location and local codes,
there may be various acceptable means of
penetrating the roof. Flashing are often used
to ensure a neat and water-tight penetration.
Regardless of the method used, insulation of
the solar lines and water-tightness must be
ensured. Roof penetrations may not impair
the function of the enclosure. All roof
penetrations must be sealed to prevent
water, vermin or any other intrusion.
Structural Supports
Any points of attachment for the solar
collector or other system components must
be of suitable structural strength to support
the weight of the components plus any
loads that may be encountered, such as wind
or snow loading.
Any damage to structural supports caused
by screws, drilled holes or other fastening
methods must not undermine the structural
integrity. Seek professional advice as
required.
Applicable Codes
All roof penetrations must meet applicable
codes, practices and building regulations. All
members penetrated by solar system
components must meet relevant codes.
Adjacent Materials
Materials adjacent to the solar system
components should not be exposed to
elevated temperatures.