UMD V3 Installation Manual - Remote Control
13 November 2018
Page
26
of
39
APPENDIX C: Installation Flow Chart
Installation Flow Chart for new or Retro Fit Installation:
This is the installation process for a Cooltrax System to a
Carrier Reefer. At the end of the process you will have
installed and fully validated the Cooltrax System.
Under no circumstances should the asset be released to the
fleet without being validated by the Cooltrax Support Staff.
Cooltrax will not be liable for costs incurred through the
asset being recalled for validation at a later time.
Note: To fully validate a Cooltrax install the asset should
have line of sight to the sky to ensure that the system can
gain a GPS fix on sufficient satellites.