background image

2. 

Safety Instructions

 

"

The device shall only be used

for its intended purpose and
in undamaged and perfect
condition!

 

"

Only genuine CEAG spare
parts may be used for re-
placement and repair!

 

"

When working on the emer-

gency luminaire make sure
that it is disconnected from
the voltage! Pay attention to
the different power supplies
in mains or battery opera-
tion. Fig.14 shows the
indication label on the
emergency luminaire.

 

"

Prior to its initial operation,

the luminaire will have to be
checked in accordance with
the instructions as per
section Installation!

 

"

Carry out the marking of the

emergency luminaire: Assign
the circuit, the luminaire No.
and ID-No. and enter them.

 

"

The manual log book shall be

performed in compliance with
the national regulations.

 

"

Any foreign matter shall be

removed from the luminaire
prior to its initial operation!

 

"

Observe the national safety

rules and regulations for pre-
vention of accidents as well
as the safety instructions
included in these operating
instruction marked with

Fig. 14

3. Conformity with

Standards

Conform to: EN 60 598-1,
EN 60 598-2-22, EN 1838, DIN
VDE 0108/10.89.
Low-voltage directive
93/68/EEC,
EMC directive 89/336/EEC.
Note: In spite of CE conformity,
there may be a mutual
influence on equipment and
luminaires.
Developed, manufactured and
tested in accordance with DIN
EN ISO 9001.

4. Technical data

Input voltage:

   230/240 V AC
                50 Hz

Rated current
(AC):

   70 mA

Power con-
sumption (AC):    16 VA
Lamp:

   8 W/T16

Rated lumi-
nous flux of
the lamp:

   450 lm

Rated lumi-
nous flux:        40% (phi

E

/phi

nominate

)

at the end of operating cycle

Insulation
class :

   II

Protection
category acc.
to EN 60529        IP 41
Option

  IP 54

Accu:        gas-tight,reloadable,

            maintenance-free

Rated operating cycle:
           1h: NC-accu 3,6V, 1,5Ah
           3h: NC-accu 3,6V, 4,0Ah
Admissible ambient
temperature
maintained light:     - 5°C...+35°C
non maintained light: 0°C...+30°C
Supply
terminals:

  5 x 2,5 mm²

Weight SV Euro 1-1/D     1,9kg
             SV Euro 1-3/D     2,1kg
             SV Euro 2-1/D     1,8kg

       SV Euro 2-3/D     2,0kg

Dimensions:   see dimensional
                     drawing on page 4

4.2 Brief Description/Area
of Application

As  self-contained luminaires
the SV Euro 1and the SV Euro
2  emergency and safety
luminaires are suitable for
installations according to VDE
0108.

5. Installation

For the mounting and
operation of electrical
apparatus, the respective

national safety regulations as
well as the general rules of
engineering will have to be
observed.

5.1 Assembly

SV Euro 1

Loose the snap hooks of the
legend cover with a qualified
slot-headed screwdriver
(Fig. 3) and lift the cover from
the enclosure. Remove the
lamp from the socket. Loose the
4 screws with a cross-slotted
screwdriver and lift the top part
of enclosure from the lower
part. According to assembly
conditions tweak out optional
the impressed cable entries
sideways or on the backside.
Enter the sealing stopper and
stamp or cut out a hole for the
using cable diameter. If the
sealing lips are damaged, re-
place the cable entries to main-
tain the protection. Unused
cable entries which are tweaked
out must be closed with sealing
stoppers (IP-degree of protec-
tion). Insert the cable in the
body of the lamp and attach it
through the 4 holes in the cor-
ners of enclosure to the wall or
ceiling with appropriate screws
(Fig. 5).

SV Euro 2

Loose the snap hooks of the
legend cover with a qualified
slot-headed screwdriver
(Fig. 3) and lift the cover from
the enclosure. Remove the
lamp from the sockets.

Summary of Contents for CEAG SV Euro 1

Page 1: ...ge und Betriebsanleitung Einzelbatterienotleuchte Zielgruppe Elektrofachkr fte Fitting and operating instructions Self contained luminaire Target group Skilled electricians SV Euro 1 SV Euro 2 400 71...

Page 2: ...komplettieren 5 5 4 berwachungeinrichtung 6 5 5 Zubeh r 6 6 Wartung Instandhaltung 7 7 Recycling 7 Contents Pos Titel Page 1 Building up 3 1 1 Dimensional drawings 4 2 Safety instructions 8 3 Conform...

Page 3: ...st button with LED Geh useoberteil Enlosure top part Akku Lampenfassungen Lamp socket Netzanschlu klemmen Mains terminals Leitungseinf hrungen Cable entrys 4 Befestigungs schrauben f r Geh useoberteil...

Page 4: ...nd Notbetrieb Bild 2 zeigt das Hinweisschild auf der Not leuchte Vor der ersten Inbetrieb nahme mu die Leuchte entsprechend den im Ab schnitt Installation genann ten Anweisungen gepr ft werden Die Not...

Page 5: ...sbrechen Leitungsein f hrungsstopfen einsetzen und ein Loch f r den verwendeten Leitungsdurchmesser ein stanzen oder einschneiden Bei Besch digung der Dicht lippen ist die Leitungseinf hrung zum Erhal...

Page 6: ...etrieben werden Bild 10 Taster LED Folien Anschlu Beim Wechsel von Taster LED oder Leiterkarte bitte Markierung 1 auf der Leiterkarte und auf der Leiterbahnfolie beachten Bild 9 5 4 berwachungsein ric...

Page 7: ...den Bestimmungen ein 6 Inspektion War tung Instandhaltung 1 1 Rastnasen der Leuchte durch die L cher nach oben f hren 1 und die Leuchte gegen die Wand bis zum Anschlag einrasten 2 2 Leitungsdurchf hru...

Page 8: ...category acc to EN 60529 IP 41 Option IP 54 Accu gas tight reloadable maintenance free Rated operating cycle 1h NC accu 3 6V 1 5Ah 3h NC accu 3 6V 4 0Ah Admissible ambient temperature maintained ligh...

Page 9: ...jum per L L Fig 13 Optionally every luminaire can be operated with light switching switched maintained light in non maintained mode without jumper L L or in maintained mode with jumper L L Fig 13 Butt...

Page 10: ......

Page 11: ...11...

Page 12: ...CEAG Notlichtsysteme GmbH Senator Schwartz Ring 26 D 59494 Soest Germany Telefon 49 29 21 69 870 Telefax 49 29 21 69 617 Internet http www ceag de E Mail Info n ceag de 400 71 350 080 X 06 04 WES...

Reviews: