Handbook for Use and Maitenance – 50000 WB-80-87-95
Edition
01/11
Revisione
00
42
50000WB_e111_E.doc
3.6 - SCHEDULE OF INSPECTIONS AND PROGRAMMED MAINTENANCE
TO BE CARRIED OUT IN AUTHORIZED WORKSHOPS.
Besides the inspections foreseen by the law concerning the security of
loading devices and their normal upkeep, that can be carried out by the
normal users , it’s necessary that the operations described at points 3.2,
3.3.4, 3.3.5, 3.3.6, and every repair are carried out at the due-dates and in
workshops authorised by Cormach S.r.l. . Here follows a table-memorandum
in which for every due-date the operations necessary on the crane are
reminded; The workshop that materially carried out the works must put its
stamps and sign to confirm the execution.
If the operations are not carried out and/or registered, this involves the loss
of the warranty and of the producer’s responsibility.
Due-date (hours
of functioning)
Points where
the perations
to be xecuted
are described
Date of
execution
Stamp and sign of
authorised workshop
Notes
300
3.2
600
3.3.4
1000
3.3.5
1200
3.3.4
1800
3.3.4
2000
3.3.5
3.3.6
2400
3.3.4
3000
3.3.4
3.3.5
3600
3.3.4
4000
3.3.5
3.3.6
4200
3.3.4