UT
Handbook for Use and Maitenance – 50000 WB-80-87-95
Edition
01/11
Revisione
00
44
50000WB_e111_E.doc
3.7 - SCHEDULE FOR WIRE ROPES AND CHAINS INSPECTIONS
The wire ropes and chains, used on the crane must be verified and results
must be recorded inside the following table. For the timing of each
inspection, refer to local prescriptions. For wire ropes, in case of missing
local standards, use ISO 4309 standards.
Verification date
Stamp and
signature of
authorised
work-shop
Note