IDC Pro 255 Operator Manual
Publication Number: 621058649OPR
- 24 -
© 2016, Cornelius Inc.
Purging The Syrup Lines
The purge process is performed as part of the “Syrup Line Cleaning & Sanitizing” section on page 25. If a BIB con-
tainer is replaced, the syrup lines need to be purged and sanitized. To purge the lines, perform the procedure in Table
13.
Table 13.
Step
Action
1
Ensure that the water and CO
2
are turned on. (initial setup only)
2
Display the keypad screen by tapping each cor-
ner of the video screen starting in the upper right
corner (1) and continuing to tap each corner in a
counterclockwise direction, in a sequence of
1,2,3 and 4 as shown in Figure 36.
NOTE: As each corner is touched, a
small confirmation rectangle may
momentarily appear to confirm
the touch.
Figure 36.
3
Input the proper password for your access level
(technician) and press Enter.
Figure 37.
4
The Service UI screen is displayed.
Figure 38.
5
Press the Unit Setup button.
1
2
3
4
5
6
7
8
9
0
Enter
<
Unit Setup
UNIT SETUP