background image

2.5

of 

.

.

4.

5.

Do not use white tape during installation.

6.

7.
8.

Improper grounding could cause electrical shock.

continue from ELECTRICAL INSTALLATION -IMPORTANT

ELECTRICAL INSTALLATION -IMPORTANT

Make sure to put the Mesh Filter between Stop Valve and incoming

water piping. 

3

.

  

 

If in any case, the Stop Valve is not use or omitted, make sure to put the 

     

  

Mesh Filter between the heater unit inlet pipe and incoming water pipe.

PLUMBING PROCEDURE - IMPORTANT

correct

over tighten and damage

7

8

(*)

To ensure the power cord NOT
touch copper flange.

G

Side Entry A

(*)

B

Summary of Contents for CIS-E363DCR

Page 1: ...Instant Water Heater CIS E363DCR CIS E369DCR User Manual ...

Page 2: ...ORMATION For Pump Model it is highly recommended to connect the Water Inlet Connection to tank storage supply otherwise it may cause damage to the Pump Motor maximum 2 working pressure of 6 bars 2 G G Fig 1 32 32 19 20 21 22 23 24 25 26 27 28 29 19 20 21 22 23 24 25 27 28 29 30 31 8 9 10 8 9 10 2 Face Sticker 1 Front Cover 3 Indicator Lamp 5 Temperature Control Knob 4 Pump Knob 6 Test Reset Button...

Page 3: ... HEATER UNIT HEATER UNIT INSTALLATION DIAGRAM RAIL BRACKET COVER CAP DISMANTLE STEPS RAIL BRACKET OPEN THE RAIL BRACKET COVER BY TURNING ANTI CLOCKWISE USING SCREW DRIVER TO OPEN THE CAP RAIL BRACKET COVER COME OUT 1 2 3 RAIN SHOWER SET INSTALLATION PROCEDURES G 65mm 255mm ...

Page 4: ... in position with the screw provided STEP 5 Mount the Slider Rail connected with Rail Bracket Adjustable Shower Holder and Selector Valve to the mounting terminal by turns the terminal cover 5 STEP 3 1200mm 650mm 100mm PVC hose rain shower head shower head 7 8 STEP 7 Connect the Rain Shower Head to the top of Slider Rail 1 5Meter PVC Hose to Hand Shower Head and 1Meter PVC Hose to the Heater Conne...

Page 5: ...LLATION IMPORTANT Make sure to put the Mesh Filter between Stop Valve and incoming water piping 3 If in any case the Stop Valve is not use or omitted make sure to put the Mesh Filter between the heater unit inlet pipe and incoming water pipe PLUMBING PROCEDURE IMPORTANT correct over tighten and damage 7 8 To ensure the power cord NOT touch copper flange G Side Entry A B ...

Page 6: ...0 Release Knob G Position this Way Position this Way 7 turn knob Press the RESET button the 3 LED indicator lights shall run ON OFF 3 times in sequences to indicate self check as in No 2 above and the Heater Unit should resume normal function the Green LED Indicator should light on Switch on the electrical supply The 3 LED indicator light shall run ON OFF 3 times in sequences to indicate the set a...

Page 7: ...soft brush from time to time Recommended once a week Note Take care not to damage the holes of the Handshower Head during cleaning 8 WIRING DIAGRAM LIVE NEUTRAL Main Supply 220 240 V a c TRIAC Lout Nout Nin Lin Electronic ELCB 15mA Sensitivity Heater Control Reset Test Pump Booster T2 G Auto Thermostat Manual Thermostat Pump On Off Power On Off Temperature Control On Off Switch Led Board SMPS PCB ...

Page 8: ... G Pump On Off Power On Off Temperature Control On Off Switch Led Board SMPS PCB ASSY Silent Pump Auto Thermostat WIRING DIAGRAM SINGLE POLE MODEL SILENT PUMP MODEL ELECTRICAL SPECIFICATION EP 6 0 Kg ELCB A C PUMP ESP 5 3 Kg ELCB SILENT PUMP 250 X 400 X 105 mm 3 3kW 230Va c 2 0 1 Bar 10kPa Min INLET WATER PRESSURE Max INLET WATER PRESSURE 6 0 Bar 0 6MPa continue from WIRING DIAGRAM WIRING DIAGRAM ...

Reviews: