background image

1LAN-SDAN-8293 
Software Defined 
Access Node 
Quick Installation Guide 
 

QUICK INSTALLATION SHEET I SDLAN-000-8293 I APRIL 2018 I 

Page 4 

3  USING SURFACE MOUNT  

CRADLE (1LAN-SDAN-SMCRD) | 

Step 1

 

Mount Dual gang box securely in wall. 

 

Figure 5 Dual Gang Box Mounting 

 

Figure 6 Fiber routing guide 

 

Figure 7 Dual Gang Box Mounting 

Step 2

 

Route cable inside box in a mannerthat 
maintains bend radius andprevents cable 
from being pinched or damaged. 

Step 3

 

Terminate fiber and copper using selected 
method (See Sections 3 and 4). 

Step 4 

Secure fiber into routing guide and 
connect to fiber input port. 

Step 5 

Connect power connection to power port. 

Step 6 

Place ONT over box aligning screw holes 
and making sure cables are routed 
securely and are not pinched or 
damaged. 

Step 7 

Using ONT mounting screws attach ONT 
to box and secure with screws. 

 

 

 

 

 
 
 
 
 

 

 

 

 

Summary of Contents for 1LAN-SDAN-8293

Page 1: ...This document describes how to install the ONT mount the ONT DC wiring connection and fiber connection Items Required For 8293 Installation The following included items are required for installing th...

Page 2: ...NSTALLATION SHEET I SDLAN 000 8293 I APRIL 2018 I Page 2 1 Connections and Ports Figure 1 8293 Access Node Ports and Connections PORTS PoE Ethernet ports 2 RJ 45 30 W PoE total between both ports Ethe...

Page 3: ...ttach entry grommet Step 3 If entering cradle from the back route cable into cradle securely from back entrance opening Step 4 Route cable inside cradle in a manner that maintains bend radius and prev...

Page 4: ...ting Step 2 Route cable inside box in a mannerthat maintains bend radius andprevents cable from being pinched or damaged Step 3 Terminate fiber and copper using selected method See Sections 3 and 4 St...

Page 5: ...catalog coc documents standar d recommended procedures 006 369 pdf Figure 8 ONT Fiber Port Step 2 Remove port cover Step 3 Plug SC APC connector into fiber port on ONT Figure 8 Step 4 Replace port co...

Page 6: ...te fiber using SC APC fusion splice pigtail Step 2 Route and secure pigtail fiber and incoming fiber in cradle or gang box to make sure it maintains accepted bend radius and fibers are not pinched or...

Page 7: ...o negative as shown in Figure 9 Figure 9 Terminating DC power connection Figure 10 ONT Power Port Step 2 Open the terminal block screw above the negative feed position and then insert the exposed blac...

Page 8: ...apter to power 1LAN SDANPWRSUP2 Figure 11 Power LEDs Step 2 Verify normal operation when unit is powered up and system is configured Refer to Figure 11 and Table 2 Table 2 ONT LED Descriptions LED Des...

Reviews: