1LAN-SDAN-8293
Software Defined
Access Node
Quick Installation Guide
QUICK INSTALLATION SHEET I SDLAN-000-8293 I APRIL 2018 I
Page 4
3 USING SURFACE MOUNT
CRADLE (1LAN-SDAN-SMCRD) |
Step 1
Mount Dual gang box securely in wall.
Figure 5 Dual Gang Box Mounting
Figure 6 Fiber routing guide
Figure 7 Dual Gang Box Mounting
Step 2
Route cable inside box in a mannerthat
maintains bend radius andprevents cable
from being pinched or damaged.
Step 3
Terminate fiber and copper using selected
method (See Sections 3 and 4).
Step 4
Secure fiber into routing guide and
connect to fiber input port.
Step 5
Connect power connection to power port.
Step 6
Place ONT over box aligning screw holes
and making sure cables are routed
securely and are not pinched or
damaged.
Step 7
Using ONT mounting screws attach ONT
to box and secure with screws.