1LAN-SDAN-8293 
Software Defined 
Access Node 
Quick Installation Guide 
 

QUICK INSTALLATION SHEET I SDLAN-000-8293 I APRIL 2018 I 

Page 5 

4  USING SURFACE MOUNT  

CRADLE (1LAN-SDAN-SMCRD) | 

Notes: Fiber can be terminated using: 

A. Unicam® Connectors 
B. Fuselite® Connectors 
C. Fusion Spliced Pigtail 

METHOD A. Unicam® SC/APC Connector | 

 

Step 1

 

Terminate fiber using Corning Unicam® standard 
recommended procedure 
(

https://www.corning.com/catalog/coc/documents/standar

d-recommended-procedures/006-369.pdf

 ). 

 

Figure 8 ONT Fiber Port 

Step 2

 

Remove port cover. 

Step 3

 

Plug SC/APC connector into fiber port on ONT (Figure 8)

Step 4 

Replace port cover making sure fiber is not pinched or 
damaged. 

METHOD B. Fuselite® SC/APC Connector | 

Step 1

 

Terminate fiber using Corning Fuselite® standard 
recommended procedure 
(

https://www.corning.com/catalog/coc/documents/standar

d-recommended-procedures/LAN-1468-AEN.pdf

 

Step 2

 

Remove port cover. 

Step 3

 

Plug SC/APC connector into fiber port on ONT Figure 8)

Step 4 

Replace port cover making sure fiber is not pinched or 
damaged. 
 

 

 

Summary of Contents for 1LAN-SDAN-8293

Page 1: ...This document describes how to install the ONT mount the ONT DC wiring connection and fiber connection Items Required For 8293 Installation The following included items are required for installing th...

Page 2: ...NSTALLATION SHEET I SDLAN 000 8293 I APRIL 2018 I Page 2 1 Connections and Ports Figure 1 8293 Access Node Ports and Connections PORTS PoE Ethernet ports 2 RJ 45 30 W PoE total between both ports Ethe...

Page 3: ...ttach entry grommet Step 3 If entering cradle from the back route cable into cradle securely from back entrance opening Step 4 Route cable inside cradle in a manner that maintains bend radius and prev...

Page 4: ...ting Step 2 Route cable inside box in a mannerthat maintains bend radius andprevents cable from being pinched or damaged Step 3 Terminate fiber and copper using selected method See Sections 3 and 4 St...

Page 5: ...catalog coc documents standar d recommended procedures 006 369 pdf Figure 8 ONT Fiber Port Step 2 Remove port cover Step 3 Plug SC APC connector into fiber port on ONT Figure 8 Step 4 Replace port co...

Page 6: ...te fiber using SC APC fusion splice pigtail Step 2 Route and secure pigtail fiber and incoming fiber in cradle or gang box to make sure it maintains accepted bend radius and fibers are not pinched or...

Page 7: ...o negative as shown in Figure 9 Figure 9 Terminating DC power connection Figure 10 ONT Power Port Step 2 Open the terminal block screw above the negative feed position and then insert the exposed blac...

Page 8: ...apter to power 1LAN SDANPWRSUP2 Figure 11 Power LEDs Step 2 Verify normal operation when unit is powered up and system is configured Refer to Figure 11 and Table 2 Table 2 ONT LED Descriptions LED Des...

Reviews: