1LAN-SDAN-8293
Software Defined
Access Node
Quick Installation Guide
QUICK INSTALLATION SHEET I SDLAN-000-8293 I APRIL 2018 I
Page 6
METHOD C. Fusion Spliced Pigtail SC/APC Connector |
Step 1
Terminate fiber using SC/APC fusion splice pigtail.
Step 2
Route and secure pigtail fiber and incoming fiber in cradle
or gang box to make sure it maintains accepted bend
radius and fibers are not pinched or damaged.
Step 3
Secure splice heat shrink.
Step 4
Remove port cover.
Step 5
Plug SC/APC connector into fiber port on ONT (Figure 8).
Step 6
Replace port cover making sure fiber is not pinched or
damaged.