18
EDGE Floorbox for installation in raised floor
EDGE_fb_0035
3.3.3 For easy access the modules/patch panels can be unlocked and pulled forward somewhat.
EDGE_fb_0013a
3.3 Patch cable installation
3.3.1
Bring the patch cables through the center cutout. Clean the LC connector and the LC adapter in the module.
3.3.2
When installing the modules/patch panels and the patch cables, ensure that there is enough overlength and
the patch cables are not strained to ensure a fitted module block is not lifted up, and not influencing the patch
cables.