STANDARD RECOMMENDED PROCEDURE 003-139-AEN | ISSUE 1 | JANUARy 2017 | PAGE 13 OF 13
Corning Optical Communications LLC • PO Box 489 • Hickory, NC 28603-0489 USA
800-743-2675 • FAX: 828-325-5060 • International: +1-828-901-5000 • www.corning.com/opcomm
Corning Optical Communications reserves the right to improve, enhance, and modify the features and specifications of Corning Optical Communications products
without prior notification. A complete listing of the trademarks of Corning Optical Communications is available at www.corning.com/opcomm/trademarks. All other
trademarks are the properties of their respective owners. Corning Optical Communications is ISO 9001 certified. © 2017 Corning Optical Communications. All
rights reserved.
10.4
. To test the remaining portions of the system (Figure 17):
Step 1:
Install the
Light Source/RJ1 LC connector adapter
onto LC number 2 of the
harness plugged into the LIVE Port of the MTP Tap module.
Step 2:
Install
Meter 1/RJ2’s LC connector
into the number 1 port of the EDGE8 module,
Module “B”.
Step 3:
Install
Meter 2/RJ3’s LC connector adapter
onto LC number 1 of the harness
plugged into the TAP port of the MTP Tap module.
Step 4:
Continue testing through on the even fibers of the harness plugged into the
front-mounted LIVE Port of the MTP Tap module using Tables 2 and 4 for testing
sequences.
Module harness
TAP port
test harness
RJ1
and
adapter
RJ2
RJ3
and
adapter
Do NOT
disconnect
EDGE8 Module “B”
HPA-1007-EDGE8
multimode only
B
2
3
B
1
2
1
A
M1
Do NOT
disconnect
0.00 dB
Light
Source
“Near end”
“Far end”
EDGE8 MTP Tap Module “A”
Note: Fiber loss
depends on length
of system
LC #8
LC #8
LC #2
M2
Do NOT
disconnect
0.00 dB
LC #1