I ns t al l at i o n C MA - XX X- A E N
P a ge 2 2
Draft
4
Installation
This document describes the installation procedure for the Corning ONE™ wireless platform mid-power remote unit (MRU).
Please refer to Chapter
3 - Installation Guidelines for specific guidelines on infrastructure planning, design and installation
or please consult with a Corning product line manager or Corning approved Installer.
4.1
Unpacking and Inspection
Unpack and inspect the cartons as follows:
1. Open the shipping cartons and carefully unpack each unit from the protective packing material.
2. Verify that all the items listed in Table
4-1 are included in the MRU package. If any of the listed items are missing, contact
your Corning representative.
3. Check for signs of external damage. If there is any damage, call your Corning representative.
Kit
Item Description
Quantity
MRU
Mid-power remote unit
Note: See ‘Appendix B: Ordering Information for
MRU part numbers.
1
Hosted
Modules
(pre-installed):
Service specific Power Amplifier
Modules (PAM) – pre-installed
according to ordered
configuration
1 - 5
Fan Module (FAM)
1
AC or DC (model dependent)
Power Entry Module (PEM)
1
AC power
cable (AC
models only)
Cable, power, straight, USA 10A
,UL, L=1.8-2.5m ,black,110V
1
Rack ears for 19-in rack (factory assembled onto
sides of MRU)
2
AK-MRU-DCA-CBL Mid-power remote unit dry contact cable
assembly (optional; ordered separately); DB9 pin
female connector cable with open wires
supporting connections to up to three dry contact
alarms
1
Table
4-1. MRU Kit Descriptions